• Two Components Polyurethane Waterproof Coating

Two Components Polyurethane Waterproof Coating

Color: Black
Appearance: Liquid
Main Raw Material: Polyurethane
Method: Spray
Level: Primer
Drying Method: Air Drying

Contact Supplier

Gold Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
SPU-311
Certification
ISO14001, CCC, RoHS
Substrate
Concrete
Components
Solvent
Transport Package
Iron Pail
Trademark
Yuhong
Origin
China
HS Code
3208901090
Production Capacity
50, 000 Ton

Product Description

SPU-311
Two Components Polyurethane Waterproof Coating
  


Two Components Polyurethane Waterproof Coating
Two Components Polyurethane Waterproof Coating
Description

SPU-311 is a synthetic polymer waterproof coating by two components reaction. Component A is a polyurethane prepolymer through the reaction between polyether polyol and isocyanate. Component B is a colorful liquid consisting of plasticizers, curing agents, thickeners, coagulants and fillers.
 
Where to use

 

  • Undergrounds, cold stores and grade;
  • Bathroom, kitchen and pools;
  • Hard to dry substrate of underground construction;
  • Subways, channels, bridges, tunnels and unexposed roofs;

 
Advantages

 

  • Can be applied on the wet underground substrate with strong bonding power;
  • Multipurpose to apply on horizontal planes, vertical planes and top planes;
  • Seamless, no pinholes and bubbles;
  • Liquid with cold applied;
  • Fast solidify and convenient to apply.

 
Standards
ASTM C 836
 

Packaging
Component A and B of SPU-311 are sealed in 8kg and 20kg pails, respectively, transported in wooden cases. Each wooden case can be contained 48 pails of component A or 36 pails of component B.
 
 
 
Storage
SPU-311 material should be stored by sealed pails at dry and well-ventilated places and protected from sun or rain. The temperature in stored places can not be higher than 40° C. It can not be closed to fire sources. The normal shelf life is 12 months.
 
Transportation
SPU-311 is needed to be avoided sunshine and rain. Fire sources are forbidden during transportation.
 
Application System

 

  • Constructive System

The system is basically consisted of substrate, additional layer, waterproof coated membrane and protection layer.
Two Components Polyurethane Waterproof Coating



 

  • Coverage

1.7kg per m2 gives dft 1mm minimum. Coverage may vary with the substrate condition during application.
 

 

  • Mixing

The ratio of component A to B is 1:2.5 according to the construction amount.
 

 

  • Application Method

Surface preparation
Surfaces should be dry, stable, clean, smooth, without pockmarks or honeycombs and free from any dusts, oil or loose particles. Cracks and surface irregularities need to be filled by sealants and do additional waterproofing. For smooth and stable surfaces, this step can be skipped.
 
Additional layer
Paint SPU-311 as additional layer to enhance at internal and external corners, drain pipes, floor drains or embedded parts.
 
Application of waterproof coated membrane
It can use rubber scrapers or spray equipments to paint 2 or 3 times. After fully dry, it can be painted again. The normal time between each painting is 24 hour. The direction of second time painting needs to be perpendicular to the first time painting.
 
Application of protection layer
After waterproof coated membrane is fully dry and meets quality requirements, it can begin application of protection layer.
 
Notice

 

  • The temperature for application of SPU-311 should be above 5ºC.
  • SPU-311 has to be used out as soon as possible and no more than 20 minutes once opened. It can not be exposed to the air for a long time.
  • The storage and application places should be well-ventilated and no fire.

Send your message to this supplier

*From:
*To:
avatar Miss Maria Ma
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now