Spu-301 One Component Polyurethane Waterproof Coating

Product Details
Certification: ISO, CE, MSDS
Material: Polyurethane, PU
Type: Waterproof Paint
Still deciding? Get samples of US$ 0/kg
Request Sample
Gold Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
745
Year of Establishment
1998-03-30
  • Spu-301 One Component Polyurethane Waterproof Coating
Find Similar Products

Basic Info.

Model NO.
SPU-301
Ceiling Tile Shape
Liquid
Function
Waterproof
Color
Black
Transport Package
Metal Pail
Specification
25kg/pail
Trademark
Oriental Yuhong
Origin
China

Product Description

PRODUCT DESCRIPTION
YH SPU-301 is a one component pitch free polyurethane based waterproof coating. It cures by reaction with atmospheric moisture to form a tough, elastomeric, waterproof membrane.


Spu-301 One Component Polyurethane Waterproof Coating
PRODUCT DATA
 
Spu-301 One Component Polyurethane Waterproof Coating

FEATURES
1. Pitch free formulation. 
2. One component. Ready to apply direct from the can (no mixing required) . 
3. Good rubber elasticity and resilience, high tensile strength, strong resistance to the deformation of base layer (shrinkage and cracking). 
4. Good bonding property, strong adhesion. 
5. Excellent water and corrosion resistance. 
6. Excellent low temperature flexibility, -35 ºC low temperature bending without cracking. 
7. Low VOC, environmental friendly.

Spu-301 One Component Polyurethane Waterproof Coating
APPLICATION
Apply to different basements; washroom, kitchen, balcony, water pool, parking lot etc.
Apply to non-exposed roof waterproof engineering.
Consumption 
When dry film thickness is 1.0mm, the dosage is about 1.6 kg/m2-1.8 kg/m2 
1. Base treatment: The base should be flat, solid, dry, no sharp convex, honeycomb, pitted and peeling, no pollution, and free from dust and dirt. It is recommended to use special primary treatment agent while the surface is porous or it is in the high temperature and high humidity or exposure environment construction. 
2. Detailing: Make the additional layers in detail node like deformation joint, water outlet, concave and convex corners. Pre-install reinforcement materials and then brush these places for 2-4 times until thoroughly penetrating into it. Keep no folds and edge warp. 
3. SPU-301 PU coating: Use rubber/metal scraper to brush or spray evenly 2-3 times. The first time should apply a thin coating film to seal the base surface's pinholes, then carry out the next coating when the previous coating is dry, normally need 12h(in low temperature shall extend the dry time), the brushing direction should be vertical to the previous one. 
4. Tip and edge seal: Add-coating for sealing. 
5. Protection layer: After the acceptance of the waterproof layer of the coating film, the protective isolation layer can be carried out according to the relevant specifications or design requirements.

STORAGE
During transportation and storage, please prevent sunlight or rain, keep away from fire, and avoid collision, kept in ventilated place. The best storage temperature is 5ºC-25ºC,the temperature is not allowed to be over 40ºC.
The shelf life is 6 months under normal transport and storage conditions.


PRECAUTIONS
Construction temperature is about 5ºC-35ºC, and construction is forbidden in rainy or snowy days. 
Stir the product evenly before using. 
The product is open-use. The remaining should be sealed in a timely manner and the open time should not exceed 4h.

CONTACT DETAILS
Beijing Oriental Yuhong Waterproof Technology Co., Ltd. 
Add: Building A, Courtyard No.19, Kechuang 9 th Street, Beijing ETDZ, Beijing, China. 
 



 
 
 
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier