Ys-207 Modified Silicone Primer for Building

Product Details
Application: Construction
Bonding Function: Structural Adhesive
Color: Colorless Transparent Liquid
Still deciding? Get samples of $ !
Request Sample
Gold Member Since 2013

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
745
Year of Establishment
1998-03-30
  • Ys-207 Modified Silicone Primer for Building
  • Ys-207 Modified Silicone Primer for Building
Find Similar Products

Basic Info.

Composition
Organic Material
Transport Package
500ml Per Iron Bucket
Trademark
Oriental Yuhong

Product Description

Technical Date Sheet(TDS)
  1. Description
YS-207 Modified silicone primer for building is a single-component base treatment agent composed of prepolymer, diluent, curing agent and additives, which can effectively improve the adhesion between colloid and base material.
  1. Use
YS-207 is a special matching primer suitable for the occasions where modified silicone MS sealantis used. Two-component modified silicone MS sealant must use it. If a single-component modified silicone sealant is used on a permeable substrate, it is recommended to use it.
  1. Advantages
  • Excellent penetration performance.
  • High adhesion to the base layer, which can effectively improve the bonding between the colloid material and the substrate.
  • Long operating time and fast curing speed after construction.
  • Single-component packaging, ready to use, simple operation.
  1. Product Details
  2. Technical Information
Item Description
Type Single component
Color Colorless transparent liquid
Packaging 500ml per iron bucket
Type l in Q/sy YHF 0107-2016 primer for sealing and caulking materials
Items Typical Value
Surface drying time 1h
Full cure time 12h
Bond strength 2.5Mpa
  1. Construction Process
  • Base treatment: The construction surface should be clean, hard and dry. Remove grease and dirt on the surface of the base, such as release agent, curing film and hydrophobic agent. 
  • Filling backing material: Paste masking tape on both sides of the glue application area and fill the backing material at the same time. 
  • Apply primer: Apply primer on the base to cover the base. Wait for 5 to 20 minutes for the primer to dry before applying glue. 
  1. Storage and Shelf life
During transportation, keep away from moisture, rain, sun, high temperature, heat source, handle with care, and avoid squeezing and collision.
The product should be stored in a ventilated, dry, cool place, and avoid direct sunlight. Isolate from fire and heat source. The storage temperature is 5ºC~30ºC, and the best storage temperature is 10ºC~25ºC
The storage period of unopened products is 6 months from the date of production. If the storage period is exceeded, it can still be used after passing the inspection.
  1. Notice
  • Avoid construction when the ambient temperature is lower than 5ºC or higher than 40ºC, and the air humidity is higher than 85%. The temperature of the coated base must be higher than the dew point temperature by more than 3ºC.
  • Construction cannot be carried out on wet concrete surfaces, especially on surfaces with clear water.
  • The unused primer after opening the barrel should be tightly covered with the barrel lid and sealed for storage.
  • The construction site should have good ventilation facilities. When construction is carried out in narrow places or places where air is not circulated, forced ventilation measures should be taken.
  • Construction workers should wear work clothes, gloves and other labor protection supplies.
  • Fireworks are strictly prohibited at the construction site, and fire-fighting facilities should be equipped.
  1. Health and Safety
Please read the safety manual carefully, our security experts will be pleased to give you advises about safety, health and environmental issues.
  1. Product Responsibility
The above information and recommendations which are based on our experience are as for reference, they can't replace the customers' own experimental results. In any application, the customer shall be responsible comply with obligations of third-party intellectual property rights. Without our consent, anyone shall not provide technical information to third parties.
  1. Other Information 
Company name:Beijing Oriental Yuhong Waterproof Technology Co., Ltd
Address:No.19, Kechuang 9th Street, BETDA, P.R. Beijing, China 101111.
   
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier