Product Description
Yuhong 100 Universal Waterproof Slurry
Yuhong 100 universal waterproof slurry is an organic liquid material composed of high quality acrylate emulsion and various
additives, and inorganic powder composed of special cement and various fillers.
Product usage
Yuhong 100 universal waterproof slurry is an organic liquid material composed of high quality acrylate emulsion and various
additives, and inorganic powder composed of special cement and various fillers.
Construction
How to coat
Grass-roots processing
* Base should be flat, solid, no open water, no floating ash, no sand, no cracks, no oil pollution and other loose animals and other defects;
* If the base is loose sand, it is recommended to use rain rainbow reinforcement to strengthen the base;
* For the pipeline slotting parts and hole cracks, it is recommended to use rain rainbow plugging treasure to smooth repair;
* Before waterproof construction, the base must be wetted to saturation with clear water, but at the same time there must be no accumulated (clear) water.
Construction process
1. ingredients: a bag of liquid with a bag of powder, first pour the liquid into the mixing barrel, while stirring slowly add powder, with an electric mixer to stir until uniform, no caking;
2. in order to improve the construction effect, this product can add water in proper amount, the whole barrel of water added no more than 500 ml;
3. detail node treatment: before the large surface brushing, the floor drain, yin-yang angle, pipe root and other easy leakage parts need to use rain rainbow plugging treasure to wipe arc strengthening treatment (diameter is about 20 mm, in order not to affect the later paste brick whichever), and then use waterproof coating for node brushing;
4. large surface brushing: waterproof film should be brushed two to three times, each time after drying before the next process, the time interval of 3~6 hours (whichever is the hand touch non-stick hand), low temperature or wet conditions should be appropriate to extend the drying time. The coating thickness of waterproof layer should be 1.2~1.5 mm, and the method of "ten" cross brushing should be adopted in construction. The closed water test can only be carried out after the film is completely dried, and the closed water time should not exceed 48 hours.
Notes
* The construction temperature should be between 5ºC~35ºC, strong wind or rain and snow weather, outdoor construction is prohibited;
* Preparation of paint should be used within 1 hour, painting process is strictly prohibited to add water;
* It is strictly forbidden to add excess water or any other material in the batching process;
* Unused liquid or powder after opening should be sealed and stored;
* Pay attention to protect waterproof film from damage during construction;
* It is recommended to use rain rainbow tile glue when laying tile on waterproof layer;
* This product contains cement and other alkaline substances, may cause skin allergies, use should do a good job of protective measures;
* If you touch your eyes, rinse immediately with clear water. If you have any discomfort, consult a doctor immediately.
Pcaking&delivery
Net content : 2 kg/Bag
Packed in wooden case or pallet,or as client required.
Various modes of transportation
Company profile